Service Details
- Home
- Service Details
As home appliances, rice cookers are mostly made in Foshan Guangdong, Ningbo Zhejiang, and qingdao Shandong. The quality inspection of electrical cookers, will be checking as follows:
We offer the below types of third party inspections for electric cookers:
Please find below for an example of a cooker onsite inspection:
ON-SITE INSPECTION CHECK LIST | COMMENTS | RESULT |
---|---|---|
Test the function of the turntray, if test model has a turntray.-II | PASSED | |
Perform a fatigue test for door and all adjustable parts.-S2 20 movements |
PASSED | |
Perform a microwave radiation emission test.-II The result should be less than 5mw/cm2 at any point 5mm from microwave. |
PASSED | |
Test all detailed functions according the instruction manual of the item's box.-II | FAILED | |
Perform an earth continuity test if applicable. -II The result of test should be <0.1ohm. |
PASSED | |
Perform an internal check.-S1 According to the BOM provided by client. a/ take all related picture to show each main component and prepare a list of them. b/ Check and show the quality of welding. c/ If the earth pin or any pin is not cinnected to wire; fail the test and put important remark. |
PASSED | |
Check the design of product to see effect.-S1 If the door is open, the magnetron can't work. |
N/A | |
Perform a Hi-pot test.-II According to UL2111 or EN60335-1: UL2111 - Less than 250v operated motors 0.5hp or less->1000V for 60S. - More than 250V operated motors or more than 0.5HP->1000+2Va for 60S EN60335-1 For less than 250V operated motors 1250/1750/3000V for60s according to the insulation (basic, supplementary, reinforced.) Take clear pictures for following information: AC/DC socket, Requested voltage and calibration label |
PASSED | |
Check the power usage (ie.: wattage).-S2 | PASSED | |
Perform a pull test for power cord-S1 pull on the cord for 25time in 1 minute. If the product has a net weight=1kg, use a force of 30N. If the product has a net weight 1kg>, =4kgs, use a force of 60N, If the product has a net weight >4kgs, use a force of 100N- The cord should not be displaced more than 2mm. Noted: Before starting the test, you should pull the cord several times to make sure that no rolled cord inside the product. |
N/A | |
Perform a stability test -S2 Perform the test on a surface inclined 10 degrees. please take clear picture to show that the product is in the most unfavourable position on the inclined plane. |
N/A | |
Perform a life/endurance test for functions other than microwave.-S1 No overheating or other problem observed. |
PASSED | |
Check the temperature at the minimum and maximum settings.-S1 Record the actual results |
PASSED |
electric cooker on-site inspection services in China, electric cooker third party on-site inspection in China, electric cooker 3rd party on-site inspection in China, China electric cooker on-site inspection services, electric cooker 3rd party on-site inspection services, electric cooker third party on-site inspection services in China, China electric cooker third party on-site inspection, electric cooker 3rd party on-site inspection services in China, electric cooker third party on-site inspection, China electric cooker 3rd party on-site inspection services, China electric cooker third party on-site inspection services, China electric cooker on-site inspection, electric cooker 3rd party on-site inspection, China electric cooker 3rd party on-site inspection, electric cooker on-site inspection in China, electric cooker on-site inspection services, electric cooker third party on-site inspection services
3rd party preshipment products goods factory onsite inline final Random AQL PSI TPI FRI DUPRO third party in-line pre-shipment QA QC check quality control assurance services in China India Vietnam Thailand Malaysia Bangladesh Taiwan.