Service Details

  • Home
  • Service Details

Electric appliance AQL inspection:


For electric appliance third party inspections, the inspector will check thoroughly the shipment as per below:

  1. Quantity Inspection/Check
  2. Packing Inspections: assortment, carton sealing, tapings, shipping marks, gift boxes and wrappings etc.
  3. Labels, SKUs, Barcodes, Logos
  4. Measurements, Sizes, Weights
  5. Colours, Assemblies
  6. Function & Safety On-site Testing
  7. Visual Defects: Critical Defects, Major Defects, Minor Defects
  8. Special requirements & attentions etc.
electric appliance AQL inspection
CHECK LIST COMMENTS RESULT
Perform a carton drop test on the export cartons:10 times(1 corner 3 edges 6 faces) Passed
Smell check-check if there are any strong offensive odor-II PASSED
For adhesive test: perform test on coating (painting/plating/ screen printing, etc) with 3M tape.-S2 PASSED
Perform a rub test for printing and marking ; Adhesive test for coating if applicable-For rub test: The durability of the marking is checked by trying to remove it by rubbing lightly for 15 s with a piece of cloth soaked with water and, if the spirit not availabel, use the 95% alcohol - After the test, the marking shall be legible, marking labels shall not be easily removable andthey shall show no curling. PASSED
Check if the base of the item wobbles by placing it on a flat, glass surface--II PASSED
perform quantity and assortment check in each package--S3 N/A
Perform a strength check.-Test all connections using normal force.-II PASSED
Perform a humidity test on solid wood and MDF parts with wood humidity tester(brand name: testo), Please fill the detail finding table for wood humidity test. The sample should be taken: - On S3; -Check the humidity for wood: check 3 points(a, b and c) per unit- For wooden items, the humidity tolerance for April to October: 12% Max -II PASSED
Perform a fatigue test on all adjustable parts.--S2 PASSED
Check all the accessories with the item.--S2 N/A
Perform an assembly check.--II PASSED
Perform a Hi-pot testing -II PASSED
Perform a voltage range test -II PASSED
Perform the standard power test-II PASSED
Function test : --II PASSED
Run the test work for 4 hour ----S2 PASSED
Leakage current test--II PASSED
Perform an internal check.-Take all related pictures to show special requirements.-S1 (5 Pcs) FAILED
Perform a life test.-Continue to run this test during the whole inspection period.-S1 (5 Pcs) PASSED

3rd party preshipment products goods factory onsite inline final Random PSI TPI FRI DUPRO third party on-site in-line pre-shipment QA QC check quality control assurance services in China India Vietnam Thailand Malaysia Bangladesh Taiwan.

 

Menu
x