Service Details

  • Home
  • Service Details

Electric kettle QC inspection:


For electric kettle inspections, the checking points are mostly:

  • Labels, markings, logos & barcodes inspections
  • On-site safety, regulation & function tests
  • Measurements & sizes checks
  • Packaging, safety and drop tests onsite
  • Aesthetic, visual defects, workmanship, surface and function checks
  • Product specs, and special requirements inspections
  • Quantity & assortment checks

There are below types of third party inspections for electric kettles:

electric kettle QC inspection

Please find below for an examples of the on-site quality inspection for electric kettles:

ON-SITE INSPECTION CHECK LIST COMMENTS RESULT
Abnormal function test (short pass the fuse) FAILED
Perform barcode check PASSED
Perform stability test :Put the product on a surface inclined to 15 degree ,the item should not tip over PASSED
Life test during the whole inspection period PASSED
Perform quantity and assortment check for each package PASSED
Earth continuity test 1 2V/25A the resistance should be below 0.1 Ohm PASSED
Perform power consumption test PASSED
Fitness check PASSED
Internal check –taking photo for all the component and list the CDF chart which should be complied with specs PASSED
Pull test on power cord Pull on the cord for 25 times in 1 minute. PASSED
Perform a temperature when the steam come out PASSED
Perform hi-pot test PASSED
Thermo link and temperature fuse test if applicable N/A
Perform a timer accuracy test for each position PASSED
Real food for some function test PASSED
Perform fatigue test for all adjustable parts PASSED
Test all detail functions according to the instruction manual&listed on the gift box PASSED

3rd party preshipment products goods factory onsite inline final Random AQL PSI TPI FRI DUPRO third party on-site in-line pre-shipment QA check quality control assurance services in China India Vietnam Thailand Malaysia Bangladesh Taiwan.

 

Menu
x