Service Details

  • Home
  • Service Details

Electric kettle shipment inspection:


For electric kettle inspections, the checking points are mostly:

  • A. Quantity inspection
  • B. Shipping marks & packing
  • C. Labels, logos and colors
  • D. Styles & measurements
  • E. Onsite safety and function tests
  • F. Special requirements
  • G. AQL workmanship
    (Visual checks)
electric kettle shipment inspection

Please find below for an examples of the on-site quality inspection for electric kettles:

ONSITE CHECK LIST COMMENTS RESULT
Internal check –taking photo for all the component and list the CDF chart which should be complied with specs FAILED
Perform a timer accuracy test for each position FAILED
Abnormal function test (short pass the fuse) PASSED
Real food for some function test PASSED
Fitness check PASSED
Test all detail functions according to the instruction manual&listed on the gift box FAILED
Perform fatigue test for all adjustable parts PASSED
Thermo link and temperature fuse test if applicable FAILED
Perform hi-pot test N/A
Pull test on power cord Pull on the cord for 25 times in 1 minute. N/A
Life test during the whole inspection period N/A
Perform barcode check N/A
Perform power consumption test N/A
Earth continuity test 1 2V/25A the resistance should be below 0.1 Ohm N/A
Perform a temperature when the steam come out PASSED
Perform stability test :Put the product on a surface inclined to 15 degree ,the item should not tip over PASSED
Perform quantity and assortment check for each package FAILED

3rd party pre products goods factory onsite inline final Random AQL PSI TPI FRI DUPRO third party on-site in-line pre- QA QC check quality control assurance services in China India Vietnam Thailand Malaysia Bangladesh Taiwan.

 

Menu
x