Service Details

  • Home
  • Service Details

Electric kettle preshipment QC:


For electric kettle inspections, the checking points are mostly:

  • A. Quantity verify
  • B. Shipping marks & packing
  • C. Labels, logos and colors
  • D. Styles & measurements
  • E. Onsite safety and function tests
  • F. Special requirements
  • G. AQL workmanship
    (Visual inspections)

There are below types of third party inspections for electric kettles:

electric kettle preshipment QC

Please find below for an examples of the on-site quality inspection for electric kettles:

ON-SITE INSPECTION LIST COMMENTS RESULT
Perform barcode check FAILED
Real food for some function test PASSED
Perform a timer accuracy test for each position FAILED
Internal check –taking photo for all the component and list the CDF chart which should be complied with specs FAILED
Thermo link and temperature fuse test if applicable PASSED
Test all detail functions according to the instruction manual&listed on the gift box PASSED
Pull test on power cord Pull on the cord for 25 times in 1 minute. FAILED
Abnormal function test (short pass the fuse) PASSED
Fitness check FAILED
Perform stability test :Put the product on a surface inclined to 15 degree ,the item should not tip over PASSED
Perform hi-pot test FAILED
Life test during the whole inspection period PASSED
Perform a temperature when the steam come out FAILED
Perform fatigue test for all adjustable parts FAILED
Earth continuity test 1 2V/25A the resistance should be below 0.1 Ohm PASSED
Perform quantity and assortment check for each package PASSED
Perform power consumption test PASSED

3rd party products goods factory onsite inline final Random AQL PSI TPI FRI DUPRO third party on-site in-line pre-shipment QA check quality control assurance inspection services in China India Vietnam Thailand Malaysia Bangladesh Taiwan.

 

Menu
x