We offer onsite quality QC check inspection services to baking ovens, gas stoves, furnaces and other cooking kitchen equipment. The inline check methods will be:
INSPECTION CHECKPOINTS | RESULTS | COMMENTS |
---|---|---|
A. Quantity check | OK | |
B. Shipping marks & packing | OK | |
C. Label, logos and colors | OK | |
D. Styles & measurements | OK | |
E. Onsite safety and function tests | NOT OK | |
F. Special requirements | OK | |
G. AQL workmanship (Visual defects) |
OK |
Below are some of the common types of pre-shipment inspection for ovens, furnace, stoves etc.:
A common checklist for quality onsite inspection for ovens:
ONSITE CHECK LIST | COMMENTS | RESULT |
---|---|---|
Perform a fatigue test for door and all adjustable parts.-S2 20 movements |
PASSED | |
Perform a life/endurance test for functions other than microwave.-S1 No overheating or other problem observed. |
PASSED | |
Test the function of the turntray, if test model has a turntray.-II | PASSED | |
Perform a microwave radiation emission test.-II The result should be less than 5mw/cm2 at any point 5mm from microwave. |
PASSED | |
Perform an internal check.-S1 According to the BOM provided by client. a/ take all related picture to show each main component and prepare a list of them. b/ Check and show the quality of welding. c/ If the earth pin or any pin is not cinnected to wire; fail the test and put important remark. |
PASSED | |
Check the temperature at the minimum and maximum settings.-S1 Record the actual results |
FAILED | |
Check the power usage (ie.: wattage).-S2 | PASSED | |
Perform an earth continuity test if applicable. -II The result of test should be <0.1ohm. |
PASSED | |
Perform a pull test for power cord-S1 pull on the cord for 25time in 1 minute. If the product has a net weight=1kg, use a force of 30N. If the product has a net weight 1kg>, =4kgs, use a force of 60N, If the product has a net weight >4kgs, use a force of 100N- The cord should not be displaced more than 2mm. Noted: Before starting the test, you should pull the cord several times to make sure that no rolled cord inside the product. |
PASSED | |
Test all detailed functions according the instruction manual of the item's box.-II | PASSED | |
Perform a Hi-pot test.-II According to UL2111 or EN60335-1: UL2111 - Less than 250v operated motors 0.5hp or less->1000V for 60S. - More than 250V operated motors or more than 0.5HP->1000+2Va for 60S EN60335-1 For less than 250V operated motors 1250/1750/3000V for60s according to the insulation (basic, supplementary, reinforced.) Take clear pictures for following information: AC/DC socket, Requested voltage and calibration label |
N/A | |
Perform a stability test -S2 Perform the test on a surface inclined 10 degrees. please take clear picture to show that the product is in the most unfavourable position on the inclined plane. |
PASSED | |
Check the design of product to see effect.-S1 If the door is open, the magnetron can't work. |
FAILED |
China oven 3rd party onsite inspection services, oven third party onsite inspection in China, oven 3rd party onsite inspection, China oven third party onsite inspection services, China oven third party onsite inspection, China oven onsite inspection services, oven onsite inspection in China, oven 3rd party onsite inspection services in China, oven onsite inspection services in China, oven onsite inspection services, oven 3rd party onsite inspection services, oven third party onsite inspection services, oven third party onsite inspection