Service Details
- Home
- Service Details
As home appliances, rice cookers are mostly made in Foshan Guangdong, Ningbo Zhejiang, and qingdao Shandong. The quality inspection of electric cookers, will be checking as follows:
INSPECTION CHECKPOINTS | RESULTS | COMMENTS |
---|---|---|
A. Quantity & assortment check | NOT OK | |
B. Shipping marks & packing | OK | |
C. Labels, logos and colors | OK | |
D. Styles & measurements | OK | |
E. Onsite safety and function tests | OK | |
F. Special requirements | NOT OK | |
G. AQL workmanship (Visual defects) |
NOT OK |
We offer the below types of third party inspections for electric cookers:
Please find below for an example of a electric cooker onsite inspection:
INSPECTION CHECK LIST | COMMENTS | RESULT |
---|---|---|
Perform a Hi-pot test.-II According to UL2111 or EN60335-1: UL2111 - Less than 250v operated motors 0.5hp or less->1000V for 60S. - More than 250V operated motors or more than 0.5HP->1000+2Va for 60S EN60335-1 For less than 250V operated motors 1250/1750/3000V for60s according to the insulation (basic, supplementary, reinforced.) Take clear pictures for following information: AC/DC socket, Requested voltage and calibration label |
FAILED | |
Perform a pull test for power cord-S1 pull on the cord for 25time in 1 minute. If the product has a net weight=1kg, use a force of 30N. If the product has a net weight 1kg>, =4kgs, use a force of 60N, If the product has a net weight >4kgs, use a force of 100N- The cord should not be displaced more than 2mm. Noted: Before starting the test, you should pull the cord several times to make sure that no rolled cord inside the product. |
FAILED | |
Test all detailed functions according the instruction manual of the item's box.-II | PASSED | |
Perform a life/endurance test for functions other than microwave.-S1 No overheating or other problem observed. |
PASSED | |
Perform a fatigue test for door and all adjustable parts.-S2 20 movements |
FAILED | |
Perform a stability test -S2 Perform the test on a surface inclined 10 degrees. please take clear picture to show that the product is in the most unfavourable position on the inclined plane. |
PASSED | |
Check the temperature at the minimum and maximum settings.-S1 Record the actual results |
PASSED | |
Perform an internal check.-S1 According to the BOM provided by client. a/ take all related picture to show each main component and prepare a list of them. b/ Check and show the quality of welding. c/ If the earth pin or any pin is not cinnected to wire; fail the test and put important remark. |
PASSED | |
Perform a microwave radiation emission test.-II The result should be less than 5mw/cm2 at any point 5mm from microwave. |
PASSED | |
Check the design of product to see effect.-S1 If the door is open, the magnetron can't work. |
FAILED | |
Check the power usage (ie.: wattage).-S2 | FAILED | |
Test the function of the turntray, if test model has a turntray.-II | PASSED | |
Perform an earth continuity test if applicable. -II The result of test should be <0.1ohm. |
PASSED |
China electric cooker 3rd party quality assurance services, electric cooker quality assurance in China, electric cooker quality assurance services in China, electric cooker 3rd party quality assurance in China, electric cooker 3rd party quality assurance services, electric cooker 3rd party quality assurance, electric cooker third party quality assurance, China electric cooker third party quality assurance services, China electric cooker quality assurance, China electric cooker third party quality assurance, electric cooker quality assurance services
3rd party preshipment products goods factory onsite inline final Random AQL PSI TPI FRI DUPRO third party on-site in-line pre-shipment QA QC check control inspection services in China India Vietnam Thailand Malaysia Bangladesh Taiwan.