The preshipment inspections for routers will verify if they work properly and the order/ product specifications are met:
INSPECTION CHECKPOINTS | RESULTS | COMMENTS |
---|---|---|
A. Quantity inspection | NOT OK | |
B. Shipping marks & packing | NOT OK | |
C. Labels, logos and colors | OK | |
D. Styles & measurements | OK | |
E. Onsite safety and function tests | OK | |
F. Special requirements | OK | |
G. AQL workmanship (Visual defects) |
OK |
Normally for this kind of QC check inspections of routers, it would be final inspections, but we also have:
An example of router onsite quality inspections fyi:
ON-SITE INSPECTION CHECK LIST | COMMENTS | RESULT |
---|---|---|
Perform a function test. All inspection procedures and specifications will according to client's requirement included: golden sample, packing requirement, Product specification, Inspection Protocol, Instruction manual, etc a. Power on/off test 5 times; b. LED/LCD/VFD display and LED indicator check; c. All input/output socket function |
FAILED | |
Error must be documented with snapshots. S/N must be recorded | PASSED | |
Perform hi-pot test if applicable | PASSED | |
Check colors, sizes, weight, logo, CD and documents only on ONE product - c.1 Check colors, sizes, weight, logo - c.2 Check CD - c.3 Check Packing List and Disclaimer |
N/A | |
Perform quantity and assortment check for all component (S2) | N/A | |
S/N for the inspected sample are written down in the our report - b.2 Capture images and record S/N of the faulty products for solving them |
PASSED | |
The DUT passes the test. If something is wrong it is recommended to turn-off the DUT and to repeat the test again. | PASSED | |
Take snapshots of ALL pallets and of the Products in the show room | PASSED | |
- c.1 Colors, sizes and weights matches the criteria defined - c.2 CD shows Teldat artwork when box is opened. It is shipped in a paper bag. CD has no visible scratch on any side. - c.3 Documents are neatly printed. Margins are OK. Paper has no marks, no dirt and they are not broken. |
PASSED | |
Collect report data. Once finished all the tests and validations the inspector has to send the Test recorded data to Teldat. Test Result Recording issue is documented in "DE201_2.5 Teldat C1+L Inspection and Testing.pdf | PASSED | |
Test DUT following the document "... C1+L Inspection and Testing.pdf". Inspector requires the herein material specified. During Test, inspector is asked to check leds. These must light perfectly. Every DUT must use their own power supply and antennas. Plastic cover has to be placed on DUT |
PASSED | |
Product internal visual inspection - f.1 Indoor cleaning. Once the DUT is opened, the inspector has to check the board - f.2 The inspector has to check the board components - f.3 Board labeling. - f.4 Screws. The inspector will review the screwing of the sample |
PASSED | |
Internal workmanship check | PASSED | |
Perform remote control test -check the distance for the remote(S2) | FAILED | |
Perform wobble test, put the unit on the flat surface ,the unit should not tip or wobble during the test | PASSED | |
Record data of the inspected sample - b.1 Write down in the report S/N of the inspected sample. - b.2 Take snapshots of the defects detected |
PASSED |
China WIFI router on-site inspection, China WIFI router 3rd party on-site inspection services, WIFI router third party on-site inspection services in China, WIFI router on-site inspection in China, China WIFI router 3rd party on-site inspection,
3rd party preshipment products goods factory onsite inline final Random AQL PSI TPI FRI DUPRO third party in-line pre-shipment QA QC check quality control assurance services in China India Vietnam Thailand Malaysia Bangladesh Taiwan.