Service Details

  • Home
  • Service Details

Tableware Inspection Services:


The preshipment inspections of tableware are very important to make sure all safety requirements, PO stipulations, production specifications are met. The quality checks will mostly follow below methods:

INSPECTION CHECKPOINTS RESULTS COMMENTS
A. Quantity check OK
B. Shipping marks & packing OK
C. Labels, logos and colors OK
D. Styles & measurements OK
E. Onsite safety and function tests OK
F. Special requirements OK
G. AQL workmanship
(Visual defects)
N/A

As the quality control inspections can happen at any stage of manufacturing, so there are:

tableware Inspection Services

The checklist for onsite quality inspection test will be like below:

ON-SITE INSPECTION LIST COMMENTS RESULT
Hand washing test -- --Wash the product with cotton fabric in cold water of room temperature (about 20--35degree) and hot water of tempertature (about 80 -- 90 degree) -- During washing, dip product into the water and wiping the whole surface of the product -No color should be removed from the item’s surface during the test and no printing, markings or paint should fade.-3 pcs PASSED
Perform a fitting test check-The lid should fit the base well.-II PASSED
If the product is designed for use in a dishwasher and/or microwave oven, place it in a dishwasher and run the dishwasher for one cycle during the inspection period and also 10 minutes in the micro-wave oven.-If the product is designed for use in a dishwasher and/or microwave oven, place it in a
dishwasher and run the dishwasher for one cycle during the inspection period and also 10 minutes in the micro-wave oven.-S2
PASSED
Test the fit of the lid. and lid can not falls off when the teapot is tilted toward 90 degrees-If the item has a lid - The lid should fit well.-S3 PASSED
Test the strength of the handle.--S2 FAILED
Test the item for water leakage during the entire inspection period.-Fill the item with water then place onto a paper to check there is no leakage at all.-S2 N/A
Compare the inspection sample with the approval sample.-II FAILED
Perform a fatigue test-On all adjustable parts. Do this 20 times.-S2 PASSED
Perform a wobble test on a flat glass panel. Check both the top rim of the glass and the bottom.-There should be no wobbling of the base or the rim.-I PASSED
Check if items stand properly when pieces are stacked up, if this test fail, please state the cause clearly on inspection report and take photos-
1)Stack the products (60 pieces for the plate/reference and 12 pieces for bowl/reference and cup/reference );
2) Ensure they can stack properly and do not wobble or tilt over-S2
PASSED
Check capacity (volume) by weighing the item or by using a capacity gauge ( the mug, bowl and the container claimed with the volumn)-The results must conform with the specifications.-S2 PASSED

3rd party preshipment products goods factory onsite inline final Random AQL PSI TPI FRI DUPRO third party on-site in-line pre-shipment QA QC check quality control assurance in China India Vietnam Thailand Malaysia Bangladesh Taiwan.

 

Menu
x