Service Details

  • Home
  • Service Details

Balloon AQL inspection:


Our quality inspections for inflatable balloons, party balloons, decoration balloons, inflatables etc. will normally follow the below checkpoints in the on-site or in-line quality check:

INSPECTION CHECKPOINTS RESULTS COMMENTS
Labels, markings, logos & barcodes quality check OK
Packaging, safety and drop tests onsite NOT OK
Quantity & assortment verifying OK
Aesthetic, visual defects, workmanship, surface and function inspection OK
On-site safety, regulation & function testing OK
Measurements & sizes check OK
Product specs, and special requirements check NOT OK

Most of the QC check inspections for this line of inflatables are as below according the production statuses:

balloon AQL inspection

As a random example, please find below quality check list for balloon QC checks:

CHECK LIST COMMENTS RESULT
Perform a carton drop test on the export cartons:10 times(1 corner 3 edges 6 faces) FAILED 
Smell check-check if there are any strong offensive odor-II PASSED 
For adhesive test: perform test on coating (painting/plating/ screen printing, etc) with 3M tape.-S2 N/A 
Perform a rub test for printing and marking ; Adhesive test for coating if applicable-For rub test: FAILED
Air inlet valve Bending and buckling test-S1 PASSED
Air inlet valve sealing performance test-S1 PASSED
After filling air load stress test.-S1(0-36 month used 25Kgs, More than 36 months used 50kgs) PASSED
Air inlet valve torque test-S1( 0.45N.M) PASSED
Air inlet valve Tensile test-S1(70N) PASSED
Perform the air pressure test-S1 PASSED
Perform a humidity test.
The sample should be taken: - On S3; - In at least 10 different cartons - Provide at least 1 picture for each measurement point position (to show where the test was done = 3 pictures totaly)-Check the humidity for wood: check 3 points(a, b and c) per unit- For wooden&Paper items, the humidity tolerance for April to October: 12% Max -II
N/A
Perform quantity and assortment check in each package--S3 PASSED
Perform a strength check.-Test all connections using normal force.-II PASSED
Check all the accessories with the item.-- II PASSED
Scan for UPC barcode label and master barcode PASSED
Perform the air pressure test-S1 PASSED
Perform an Application Function check-II PASSED

3rd party preshipment products goods factory onsite inline final Random PSI TPI FRI DUPRO third party on-site in-line pre-shipment QA QC check quality control assurance services in China India Vietnam Thailand Malaysia Bangladesh Taiwan.

 

Menu
x