Service Details
- Home
- Service Details
How to do Quality Pre-shipment Inspections for Power Tools?
The onsite quality check for power tools we have:
The quality inspections for power tools will be like below:
ONSITE INSPECTION CHECK LIST | COMMENTS | RESULT |
---|---|---|
Pull testing(60N) for Power cord test. -S2 | PASSED | |
Perform a voltage range test -II (额定电压的+-10%) | PASSED | |
PLUG& Power Cord view-S2 | PASSED | |
Perform a fatigue test for all adjustable parts: Do this 20 times for assemble and sand paper on tool head – There should be no damage to the item. ----S2 |
FAILED | |
Run the test work for 4 hour ----S2 | PASSED | |
Power cable Size 4m for all item-S2 | N/A | |
Other test | PASSED | |
Perform the standard power test-II. | PASSED | |
Leakage current test--II | FAILED | |
Power consumption test-The voltage input should be the same as rating voltage in rating label, otherwise the result of power consumption will not be accurate--II |
N/A | |
Perform a rub test for printing and marking ; Adhesive test for coating if applicable-For rub test: The durability of the marking is checked by trying to remove it by rubbing lightly for 15 s with a piece of cloth soaked with water and, after drying, for a further 15 s with a piece of cloth soaked with petroleum spirit; if the spirit not availabel, use the 95% alcohol - After the test, the marking shall be legible, marking labels shall not be easily removable andthey shall show no curling. | PASSED | |
Perform a strength check.-Test all connections using normal force.-II | PASSED | |
Serial no(此批产品的序列号) | PASSED | |
No load speed:(额定电压的空载转度)—S2 | FAILED | |
perform quantity and assortment check in each package--S1 | PASSED | |
.Perform a carton drop test on the export cartons:10 times(1 corner 3 edges 6 faces) The Carton should fall down At 61cm height without damage-S1 |
PASSED | |
Perform an internal check.- Internal check: take a photo to show all that the item contains All the components specified by the client. need to write down the marking on all critical components-All Internal wiring should be routed to provide sufficient creep age and clearance distances and to so as to avoid damage to the insulation. All screws should be found, they should be fully tightened and with no damage to the screw heads. request at least one picture to show the whole construction of product-S1 |
PASSED | |
Check if the base of the item wobbles by placing it on a flat, glass surface--II | PASSED | |
Application testing and Real function test-S1 | PASSED | |
For 3M tape adhesive test: perform test on coating (painting/plating/ screen printing, etc) with 3M tape.-S2 | FAILED | |
Perform a normal function test. .-II | FAILED | |
Perform a barcode –scanning test .The barcode should be scannable and have the correct number for all barcode label. (-S3) | PASSED | |
Perform an assembly test. | PASSED | |
Disc Size | PASSED |
3rd party products goods factory onsite inline final Random AQL PSI TPI FRI DUPRO third party on-site in-line pre-shipment QA QC check quality control assurance services in China India Vietnam Thailand Malaysia Bangladesh Taiwan.