Service Details
- Home
- Service Details
There are below on-site in-line quality check procedures for the electric tool inspections:
An example of the third party inspections for electric tools:
ONSITE CHECK LIST | COMMENTS | RESULT |
---|---|---|
Perform a rub test for printing and marking ; Adhesive test for coating if applicable-For rub test: The durability of the marking is checked by trying to remove it by rubbing lightly for 15 s with a piece of cloth soaked with water and, after drying, for a further 15 s with a piece of cloth soaked with petroleum spirit; if the spirit not availabel, use the 95% alcohol - After the test, the marking shall be legible, marking labels shall not be easily removable andthey shall show no curling. | PASSED | |
Perform a strength check.-Test all connections using normal force.-II | PASSED | |
Perform a fatigue test for all adjustable parts: Do this 20 times for assemble and sand paper on tool head – There should be no damage to the item. ----S2 |
PASSED | |
Perform a barcode –scanning test .The barcode should be scannable and have the correct number for all barcode label. (-S3) | PASSED | |
Perform a voltage range test -II (额定电压的+-10%) | N/A | |
Disc Size(打磨刀片尺寸) | PASSED | |
Pull testing(60N) for Power cord test. -S2 | FAILED | |
Leakage current test--II | PASSED | |
Run the test work for 4 hour ----S2 | PASSED | |
Check if the base of the item wobbles by placing it on a flat, glass surface--II | PASSED | |
Power cable Size 4m for all item-S2 | PASSED | |
.Perform a carton drop test on the export cartons:10 times(1 corner 3 edges 6 faces) The Carton should fall down At 61cm height without damage-S1 |
FAILED | |
PLUG& Power Cord view-S2 | PASSED | |
Serial no(此批产品的序列号) | PASSED | |
Perform a Hi-pot testing -II | PASSED | |
Other test | FAILED | |
Application testing and Real function test-S1 | FAILED | |
Perform a normal function test. .-II | FAILED | |
Power consumption test-The voltage input should be the same as rating voltage in rating label, otherwise the result of power consumption will not be accurate--II |
PASSED | |
No load speed:(额定电压的空载转度)—S2 | FAILED | |
Perform an assembly test. | FAILED | |
Perform an internal check.- Internal check: take a photo to show all that the item contains All the components specified by the client. need to write down the marking on all critical components-All Internal wiring should be routed to provide sufficient creep age and clearance distances and to so as to avoid damage to the insulation. All screws should be found, they should be fully tightened and with no damage to the screw heads. request at least one picture to show the whole construction of product-S1 |
PASSED | |
Smell check-check if there are any strong offensive odor-II | PASSED | |
perform quantity and assortment check in each package--S1 | FAILED | |
Perform the standard power test-II. | PASSED | |
For 3M tape adhesive test: perform test on coating (painting/plating/ screen printing, etc) with 3M tape.-S2 | PASSED |
electric tool third party QC services, electric tool third party QC services, China electric tool 3rd party QC services, electric tool third party QC services in China, electric tool 3rd party QC services in China, electric tool QC services in China, China electric tool QC services, electric tool QC services in China, electric tool QC services, electric tool third party QC services in China, China electric tool 3rd party QC services, China electric tool QC services, China electric tool third party QC services, electric tool 3rd party QC services, China electric tool third party QC services, electric tool 3rd party QC services, electric tool 3rd party QC services in China
3rd party preshipment products goods factory onsite inline final Random AQL PSI TPI FRI DUPRO third party on-site in-line pre-shipment QA check quality control assurance inspection in China India Vietnam Thailand Malaysia Bangladesh Taiwan.