Electric tool on-site inspection:


There are below on-site in-line quality check procedures for the electric tool inspections:

  • A. Quantity check
  • B. Shipping marks & packing
  • C. Labels, logos and colors
  • D. Styles & measurements
  • E. Onsite safety and function tests
  • F. Special requirements
  • G. AQL workmanship
    (Visual inspections)
Electric tool on-site inspection

An example of the third party inspections for electric tools:

ON-SITE INSPECTION LIST COMMENTS RESULT
Run the test work for 4 hour ----S2 PASSED
Power consumption test-The voltage input should be the same as rating voltage in rating label, otherwise the result of power
consumption will not be accurate--II
PASSED
Smell check-check if there are any strong offensive odor-II PASSED
Serial no(此批产品的序列号) N/A
Perform a barcode –scanning test .The barcode should be scannable and have the correct number for all barcode label. (-S3) PASSED
Perform a Hi-pot testing -II FAILED
Perform a strength check.-Test all connections using normal force.-II PASSED
PLUG& Power Cord view-S2 PASSED
Pull testing(60N) for Power cord test. -S2 PASSED
Perform the standard power test-II. PASSED
perform quantity and assortment check in each package--S1 PASSED
Perform a normal function test. .-II PASSED
Perform a rub test for printing and marking ; Adhesive test for coating if applicable-For rub test: The durability of the marking is checked by trying to remove it by rubbing lightly for 15 s with a piece of cloth soaked with water and, after drying, for a further 15 s with a piece of cloth soaked with petroleum spirit; if the spirit not availabel, use the 95% alcohol - After the test, the marking shall be legible, marking labels shall not be easily removable andthey shall show no curling. PASSED
Perform a voltage range test -II (额定电压的+-10%) PASSED
Perform an assembly test. PASSED
Other test PASSED
Check if the base of the item wobbles by placing it on a flat, glass surface--II PASSED
Power cable Size 4m for all item-S2 PASSED
Perform a fatigue test for all adjustable parts:
Do this 20 times for assemble and sand paper on tool head –
There should be no damage to the item. ----S2
FAILED
.Perform a carton drop test on the export cartons:10 times(1 corner 3 edges 6 faces)
The Carton should fall down At 61cm height without damage-S1
PASSED
Application testing and Real function test-S1 PASSED
Disc Size(打磨刀片尺寸) PASSED
Perform an internal check.- Internal check: take a photo to show all that the item contains
All the components specified by the client. need to write down
the marking on all critical components-All Internal wiring should be routed to provide sufficient creep age and clearance distances and to so as to avoid damage to the insulation.
All screws should be found, they should be fully tightened
and with no damage to the screw heads. request at least one picture to show the whole construction of product-S1
FAILED
Leakage current test--II PASSED
For 3M tape adhesive test: perform test on coating (painting/plating/ screen printing, etc) with 3M tape.-S2 PASSED
No load speed:(额定电压的空载转度)—S2 N/A

3rd party preshipment products goods factory onsite inline final Random AQL PSI TPI FRI DUPRO third party in-line pre-shipment QA QC check quality control assurance services in China India Vietnam Thailand Malaysia Bangladesh Taiwan.

 