There are below on-site in-line quality check procedures for the electric tool inspections:
An example of the third party inspections for electric tools:
CHECK LIST | COMMENTS | RESULT |
---|---|---|
Perform a voltage range test -II (额定电压的+-10%) | PASSED | |
PLUG& Power Cord view-S2 | PASSED | |
Perform a barcode –scanning test .The barcode should be scannable and have the correct number for all barcode label. (-S3) | PASSED | |
Power consumption test-The voltage input should be the same as rating voltage in rating label, otherwise the result of power consumption will not be accurate--II |
N/A | |
perform quantity and assortment check in each package--S1 | PASSED | |
Power cable Size 4m for all item-S2 | FAILED | |
Smell check-check if there are any strong offensive odor-II | PASSED | |
Perform an assembly test. | PASSED | |
Disc Size(打磨刀片尺寸) | N/A | |
Perform a Hi-pot testing -II | N/A | |
Pull testing(60N) for Power cord test. -S2 | FAILED | |
Perform the standard power test-II. | FAILED | |
Perform a strength check.-Test all connections using normal force.-II | PASSED | |
Perform an internal check.- Internal check: take a photo to show all that the item contains All the components specified by the client. need to write down the marking on all critical components-All Internal wiring should be routed to provide sufficient creep age and clearance distances and to so as to avoid damage to the insulation. All screws should be found, they should be fully tightened and with no damage to the screw heads. request at least one picture to show the whole construction of product-S1 |
PASSED | |
Perform a rub test for printing and marking ; Adhesive test for coating if applicable-For rub test: The durability of the marking is checked by trying to remove it by rubbing lightly for 15 s with a piece of cloth soaked with water and, after drying, for a further 15 s with a piece of cloth soaked with petroleum spirit; if the spirit not availabel, use the 95% alcohol - After the test, the marking shall be legible, marking labels shall not be easily removable andthey shall show no curling. | PASSED | |
.Perform a carton drop test on the export cartons:10 times(1 corner 3 edges 6 faces) The Carton should fall down At 61cm height without damage-S1 |
N/A | |
Check if the base of the item wobbles by placing it on a flat, glass surface--II | PASSED | |
Perform a fatigue test for all adjustable parts: Do this 20 times for assemble and sand paper on tool head – There should be no damage to the item. ----S2 |
PASSED | |
Run the test work for 4 hour ----S2 | PASSED | |
Serial no(此批产品的序列号) | FAILED | |
For 3M tape adhesive test: perform test on coating (painting/plating/ screen printing, etc) with 3M tape.-S2 | FAILED | |
Perform a normal function test. .-II | PASSED | |
No load speed:(额定电压的空载转度)—S2 | FAILED | |
Leakage current test--II | N/A | |
Other test | PASSED | |
Application testing and Real function test-S1 | PASSED |
China electric tool preshipment QC, electric tool 3rd party preshipment QC, electric tool preshipment QC services, China electric tool third party preshipment QC, electric tool third party preshipment QC services in China, China electric tool 3rd party preshipment QC, China electric tool third party preshipment QC services, electric tool 3rd party preshipment QC services in China, electric tool third party preshipment QC in China, electric tool preshipment QC in China, electric tool third party preshipment QC, China electric tool 3rd party preshipment QC services, electric tool 3rd party preshipment QC services, electric tool preshipment QC services in China, China electric tool preshipment QC services, electric tool 3rd party preshipment QC in China, electric tool third party preshipment QC services
3rd party products goods factory onsite inline final Random AQL PSI TPI FRI DUPRO third party on-site in-line pre-shipment QA check quality control assurance inspection services in China India Vietnam Thailand Malaysia Bangladesh Taiwan.