Service Details
- Home
- Service Details
There are below on-site in-line quality check procedures for the electric tool inspections:
An example of the third party inspections for electric tools:
ONSITE INSPECTION CHECK LIST | COMMENTS | RESULT |
---|---|---|
Other test | N/A | |
Leakage current test--II | PASSED | |
Perform a rub test for printing and marking ; Adhesive test for coating if applicable-For rub test: The durability of the marking is checked by trying to remove it by rubbing lightly for 15 s with a piece of cloth soaked with water and, after drying, for a further 15 s with a piece of cloth soaked with petroleum spirit; if the spirit not availabel, use the 95% alcohol - After the test, the marking shall be legible, marking labels shall not be easily removable andthey shall show no curling. | FAILED | |
Perform an assembly test. | FAILED | |
For 3M tape adhesive test: perform test on coating (painting/plating/ screen printing, etc) with 3M tape.-S2 | N/A | |
Pull testing(60N) for Power cord test. -S2 | PASSED | |
Power cable Size 4m for all item-S2 | FAILED | |
PLUG& Power Cord view-S2 | PASSED | |
Serial no(此批产品的序列号) | FAILED | |
.Perform a carton drop test on the export cartons:10 times(1 corner 3 edges 6 faces) The Carton should fall down At 61cm height without damage-S1 |
PASSED | |
perform quantity and assortment check in each package--S1 | PASSED | |
Perform a fatigue test for all adjustable parts: Do this 20 times for assemble and sand paper on tool head – There should be no damage to the item. ----S2 |
PASSED | |
Power consumption test-The voltage input should be the same as rating voltage in rating label, otherwise the result of power consumption will not be accurate--II |
FAILED | |
Perform a voltage range test -II (额定电压的+-10%) | PASSED | |
Perform a Hi-pot testing -II | PASSED | |
Application testing and Real function test-S1 | N/A | |
Perform the standard power test-II. | PASSED | |
Perform a strength check.-Test all connections using normal force.-II | N/A | |
Perform an internal check.- Internal check: take a photo to show all that the item contains All the components specified by the client. need to write down the marking on all critical components-All Internal wiring should be routed to provide sufficient creep age and clearance distances and to so as to avoid damage to the insulation. All screws should be found, they should be fully tightened and with no damage to the screw heads. request at least one picture to show the whole construction of product-S1 |
PASSED | |
Perform a barcode –scanning test .The barcode should be scannable and have the correct number for all barcode label. (-S3) | PASSED | |
No load speed:(额定电压的空载转度)—S2 | FAILED | |
Perform a normal function test. .-II | PASSED | |
Run the test work for 4 hour ----S2 | PASSED | |
Smell check-check if there are any strong offensive odor-II | PASSED | |
Disc Size(打磨刀片尺寸) | PASSED | |
Check if the base of the item wobbles by placing it on a flat, glass surface--II | PASSED |
electric tool third party inspector in China, electric tool 3rd party inspector services in China, China electric tool inspector services, electric tool third party inspector, electric tool inspector in China, electric tool 3rd party inspector in China, China electric tool third party inspector, electric tool inspector services in China, electric tool inspector services, China electric tool inspector, electric tool third party inspector services in China, China electric tool 3rd party inspector services, China electric tool 3rd party inspector, electric tool third party inspector services, China electric tool third party inspector services, electric tool 3rd party inspector, electric tool 3rd party inspector services
3rd party preshipment products goods factory onsite inline final Random AQL PSI TPI FRI DUPRO third party on-site in-line pre-shipment QA QC check quality control assurance inspection services in China India Vietnam Thailand Malaysia Bangladesh Taiwan.