Service Details
- Home
- Service Details
For fitting QC checks, the inspection will mostly focuses on size checks to make sure all measurements are within tolerances. the inspections for fittings have below types:
The pre-shipment inspections for fittings include below checks too:
INSPECTION CHECKPOINTS | RESULTS | COMMENTS |
---|---|---|
A. Quantity inspection | OK | |
B. Shipping marks & packing | OK | |
C. Labels, logos and colors | OK | |
D. Styles & measurements | OK | |
E. Onsite safety and function tests | NOT OK | |
F. Special requirements | OK | |
G. AQL workmanship (Visual checks) |
N/A |
Please find below for a fitting quality inspection checkpoints for reference:
ON-SITE INSPECTION CHECK LIST | COMMENTS | RESULT |
---|---|---|
Please, check that ALL boxes have the importer sticker refer to the attachment | PASSED | |
Perform adhesive test on galvanization. Galv.coat should not come off. You can use stout knife to detect. 1 pcs per item | PASSED | |
Check the carton design refer to the attachment | PASSED | |
Check that labels in cartons are placed right side up on the boxes. Please, take picture | PASSED | |
Electric galvanized finish. Surface should have a homogeneous coat of galvanization. | PASSED | |
Inspect the quality of the fittings thread. Please, use a galvanized plug with perfect thread for all references detailed refer to the attachment The screwing process must be smooth. Threads cannot be broken 1pc per item | N/A | |
Check for absence of fittings description debossed on the piece itself. For example,galvanized tee 1/2 inch must be embossed on the body (1/2). Lack of this should be considered as a defect. Level II | FAILED | |
Check weights as per attached file (only for the items highlighted in yellow). Check 5 pcs per item and record the 5 result one by one. | PASSED | |
Barcode scanning for both bags and cartons.take picture of all carton and bag label ofproducts, two pcs for each item at least | FAILED | |
Check that total quantity per SKU matches to the attachment | PASSED | |
Both cartons and bags should have labels.Absent of a label will be considered as defect-level II | PASSED | |
Assembly and fitting test 1pcs per item | PASSED | |
Check that the SKU the carton label indicates, corresponds to the product inside – level II | FAILED | |
check that number of pieces that the carton label reads, corresponds to the actual number of pieces packed. – level II | PASSED |
fitting third party in-line inspection in China, fitting in-line inspection in China, fitting third party in-line inspection services in China, China fitting third party in-line inspection services, China fitting in-line inspection, fitting third party in-line inspection services, fitting 3rd party in-line inspection services in China, fitting 3rd party in-line inspection, China fitting third party in-line inspection, fitting in-line inspection services in China, China fitting 3rd party in-line inspection services, fitting third party in-line inspection, China fitting 3rd party in-line inspection, China fitting in-line inspection services, fitting 3rd party in-line inspection in China, fitting 3rd party in-line inspection services, fitting in-line inspection services
3rd party preshipment products goods factory onsite inline final Random AQL PSI TPI FRI DUPRO third party on-site pre-shipment QA QC check quality control assurance services in China India Vietnam Thailand Malaysia Bangladesh Taiwan.