Service Details

  • Home
  • Service Details

fitting pre-shipment inspection:


How to do on-site inspections for fittings?

  • Product specs, and special requirements check
  • Aesthetic, visual defects, workmanship, surface and function check
  • Packaging, safety and drop tests
  • Quantity & assortment verifying
  • Labels, markings, logos & barcodes check
  • Measurements & sizes check
  • On-site safety, regulation & function testing
fitting pre-shipment inspection

As an example, we have a checklist like this:

As an example, we have a checklist for Fittings like this:

  • Barcode scanning for both bags and cartons.take picture of all carton and bag label ofproducts, two pcs for each item at least
  • Both cartons and bags should have labels.Absent of a label will be considered as defect-level II
  • Check the carton design refer to the attachment
  • Perform adhesive test on galvanization. Galv.coat should not come off. You can use stout knife to detect. 1 pcs per item
  • check that number of pieces that the carton label reads, corresponds to the actual number of pieces packed. – level II
  • Check that the SKU the carton label indicates, corresponds to the product inside – level II
  • Check that labels in cartons are placed right side up on the boxes. Please, take picture
  • Check for absence of fittings description debossed on the piece itself. For example,galvanized tee 1/2 inch must be embossed on the body (1/2). Lack of this should be considered as a defect. Level II
  • Assembly and fitting test 1pcs per item
  • Inspect the quality of the fittings thread. Please, use a galvanized plug with perfect thread for all references detailed refer to the attachment The screwing process must be smooth. Threads cannot be broken 1pc per item
  • Check that total quantity per SKU matches to the attachment
  • Check weights as per attached file (only for the items highlighted in yellow). Check 5 pcs per item and record the 5 result one by one.
  • Electric galvanized finish. Surface should have a homogeneous coat of galvanization.
  • Please, check that ALL boxes have the importer sticker refer to the attachment
  • Please, check pallet packing is as attached.
  • Please finished the measurement chart and sent it to us
  • Pls list all the carton number per PO which you have checked (for example "PO XXX:4.12 ... )

3rd party preshipment products goods factory onsite inline final Random AQL PSI TPI FRI DUPRO third party on-site in-line QA QC check quality control assurance services in China India Vietnam Thailand Malaysia Bangladesh Taiwan.

 

Menu
x