Service Details

  • Home
  • Service Details

Electric cooker inspection:


As home appliances, rice cookers are mostly made in Foshan Guangdong, Ningbo Zhejiang, and qingdao Shandong. The quality inspection of electric cookers, will be checking as follows:

  • A. Quantity verify
  • B. Shipping marks & packing
  • C. Labels, logos and colors
  • D. Styles & measurements
  • E. Onsite safety and function tests
  • F. Special requirements
  • G. AQL workmanship
    (Visual checks)
electric cooker inspection

Please find below for an example of a cooker onsite inspection:

ONSITE INSPECTION CHECK LIST COMMENTS RESULT
Test all detailed functions according the instruction manual of the item's box.-II PASSED
Test the function of the turntray, if test model has a turntray.-II FAILED
Perform an internal check.-S1
According to the BOM provided by client.
a/ take all related picture to show each main component and prepare a list of them.
b/ Check and show the quality of welding.
c/ If the earth pin or any pin is not cinnected to wire; fail the test and put important remark.
PASSED
Check the power usage (ie.: wattage).-S2 PASSED
Perform a Hi-pot test.-II
According to UL2111 or EN60335-1:
UL2111
- Less than 250v operated motors 0.5hp or less->1000V for 60S.
- More than 250V operated motors or more than 0.5HP->1000+2Va for 60S
EN60335-1
For less than 250V operated motors 1250/1750/3000V for60s according to the insulation (basic, supplementary, reinforced.)
Take clear pictures for following information: AC/DC socket, Requested voltage and calibration label
PASSED
Perform a stability test -S2
Perform the test on a surface inclined 10 degrees. please take clear picture to show that the product is in the most unfavourable position on the inclined plane.
PASSED
Perform a microwave radiation emission test.-II
The result should be less than 5mw/cm2 at any point 5mm from microwave.
N/A
Perform a pull test for power cord-S1
pull on the cord for 25time in 1 minute. If the product has a net weight, 4kgs, use a force of 100N- The cord should not be displaced more than 2mm.
Noted: Before starting the test, you should pull the cord several times to make sure that no rolled cord inside the product.
PASSED
Perform a life/endurance test for functions other than microwave.-S1
No overheating or other problem observed.
PASSED
Check the temperature at the minimum and maximum settings.-S1
Record the actual results
PASSED
Perform a fatigue test for door and all adjustable parts.-S2
20 movements
PASSED
Perform an earth continuity test if applicable. -II
The result of test should be <0.1ohm.
PASSED
Check the design of product to see effect.-S1
If the door is open, the magnetron can't work.
PASSED

3rd party preshipment products goods factory onsite inline final Random AQL PSI TPI FRI DUPRO third party on-site in-line pre-shipment QA QC check quality control assurance services in China India Vietnam Thailand Malaysia Bangladesh Taiwan.

 

Menu
x