Service Details

  • Home
  • Service Details

Jewelry box factory Check:


The quality inspection procedures for Jewelry boxes are mostly as follows:

INSPECTION CHECKPOINTS RESULTS COMMENTS
A. Quantity inspection OK
B. Shipping marks & packing OK
C. Labels, logos and colors OK
D. Styles & measurements OK
E. Onsite safety and function tests OK
F. Special requirements OK
G. AQL workmanship
(Visual inspections)
NOT OK
jewelry box factory Check

Please find below for a on-site checklist for jewelry box inspections:

ONSITE CHECK LIST COMMENTS RESULT
Check all the accessories with the item.-- II PASSED
For adhesive test: perform test on coating (painting/plating/ screen printing, etc) with 3M tape.-S2 PASSED
For the LFC bags, all bags should have easy peel price label on the top right
(please try and peel the label off).试着可撕开不可有胶渍在盒子上并拍照(提交报告时将中文删除)
N/A
Perform quantity and assortment check in each package--S3 PASSED
Check PAPER WEIGHT(GSM)
Pick 1 sample and cut 10cm x 10cm square and weigh the paper?
For example: 250gsm board should weight 2.5g
FAILED
Perform a strength check.-Test all connections using normal force.-II FAILED
Perform a rub test for printing and marking ; Adhesive test for coating if applicable-For rub test: The durability of the marking is checked by trying to remove it by rubbing lightly for 15 s with a piece of cloth soaked with water and, after drying, for a further 15 s with a piece of cloth soaked with petroleum spirit; if the spirit not available , use the 95% alcohol - After the test, the marking shall be legible, marking labels shall not be easily removable and they shall show no curling. FAILED
Perform a carton drop test on the export cartons:10 times(1 corner 3 edges 6 faces) PASSED
Check the all label position is correct for all Item PASSED
Scan for UPC barcode label and master barcode PASSED
Perform a humidity test。 The sample should be taken: - On S3; - In at least 10 different cartons - Provide at least 1 picture for each measurement point position (to show where the test was done = 3 pictures totaly)-Check the humidity for wood: check 3 points(a, b and c) per unit- For wooden items, the humidity tolerance for April to October: 12% Max -II PASSED
Perform a fatigue test on all adjustable parts.--S2 PASSED

3rd party preshipment products goods onsite inline final Random AQL PSI TPI FRI DUPRO third party on-site in-line pre-shipment QA QC quality control assurance inspection services in China India Vietnam Thailand Malaysia Bangladesh Taiwan.

 

Menu
x