Service Details
- Home
- Service Details
For electric kettle inspections, the checking points are mostly:
There are below types of third party inspections for electric kettles:
Please find below for an examples of the on-site quality inspection for electric kettles:
ONSITE CHECK LIST | COMMENTS | RESULT |
---|---|---|
Perform hi-pot test | PASSED | |
Internal check –taking photo for all the component and list the CDF chart which should be complied with specs | FAILED | |
Perform a timer accuracy test for each position | FAILED | |
Perform fatigue test for all adjustable parts | PASSED | |
Perform stability test :Put the product on a surface inclined to 15 degree ,the item should not tip over | PASSED | |
Abnormal function test (short pass the fuse) | PASSED | |
Perform barcode check | PASSED | |
Pull test on power cord Pull on the cord for 25 times in 1 minute. | PASSED | |
Test all detail functions according to the instruction manual&listed on the gift box | PASSED | |
Perform power consumption test | PASSED | |
Perform a temperature when the steam come out | FAILED | |
Fitness check | PASSED | |
Earth continuity test 1 2V/25A the resistance should be below 0.1 Ohm | PASSED | |
Real food for some function test | FAILED | |
Life test during the whole inspection period | PASSED | |
Thermo link and temperature fuse test if applicable | PASSED | |
Perform quantity and assortment check for each package | FAILED |
3rd party preshipment products goods factory onsite inline final Random AQL PSI TPI FRI DUPRO third party on-site in-line QA QC check quality control assurance services in China India Vietnam Thailand Malaysia Bangladesh Taiwan.