Service Details

  • Home
  • Service Details

Electric cooker final inspection:


As home appliances, rice cookers are mostly made in Foshan Guangdong, Ningbo Zhejiang, and qingdao Shandong. The quality inspection of electric cookers, will be checking as follows:

INSPECTION CHECKPOINTS RESULTS COMMENTS
Quantity & assortment inspections NOT OK
Labels, markings, logos & barcodes checks NOT OK
Product specs, and special requirements verifying NOT OK
Measurements & sizes inspections N/A
Aesthetic, visual defects, workmanship, surface and function inspections OK
Packaging, safety and drop tests onsite OK
On-site safety, regulation & function tests OK

We offer the below types of third party inspections for electric cookers:

electric cooker final inspection

Please find below for an example of a electric cooker onsite inspection:

ONSITE CHECK LIST COMMENTS RESULT
Perform an earth continuity test if applicable. -II
The result of test should be <0.1ohm.
PASSED
Check the design of product to see effect.-S1
If the door is open, the magnetron can't work.
PASSED
Perform an internal check.-S1
According to the BOM provided by client.
a/ take all related picture to show each main component and prepare a list of them.
b/ Check and show the quality of welding.
c/ If the earth pin or any pin is not cinnected to wire; fail the test and put important remark.
PASSED
Perform a microwave radiation emission test.-II
The result should be less than 5mw/cm2 at any point 5mm from microwave.
PASSED
Perform a Hi-pot test.-II
According to UL2111 or EN60335-1:
UL2111
- Less than 250v operated motors 0.5hp or less->1000V for 60S.
- More than 250V operated motors or more than 0.5HP->1000+2Va for 60S
EN60335-1
For less than 250V operated motors 1250/1750/3000V for60s according to the insulation (basic, supplementary, reinforced.)
Take clear pictures for following information: AC/DC socket, Requested voltage and calibration label
PASSED
Perform a stability test -S2
Perform the test on a surface inclined 10 degrees. please take clear picture to show that the product is in the most unfavourable position on the inclined plane.
PASSED
Test the function of the turntray, if test model has a turntray.-II PASSED
Check the power usage (ie.: wattage).-S2 PASSED
Check the temperature at the minimum and maximum settings.-S1
Record the actual results
PASSED
Test all detailed functions according the instruction manual of the item's box.-II FAILED
Perform a pull test for power cord-S1
pull on the cord for 25time in 1 minute. If the product has a net weight, 4kgs, use a force of 100N- The cord should not be displaced more than 2mm.
Noted: Before starting the test, you should pull the cord several times to make sure that no rolled cord inside the product.
FAILED
Perform a fatigue test for door and all adjustable parts.-S2
20 movements
FAILED
Perform a life/endurance test for functions other than microwave.-S1
No overheating or other problem observed.
PASSED

3rd party preshipment products goods factory onsite inline Random AQL PSI TPI FRI DUPRO third party on-site in-line pre-shipment QA QC check quality control assurance services in China India Vietnam Thailand Malaysia Bangladesh Taiwan.

 

Menu
x