Service Details
- Home
- Service Details
Most of the Electromagnetic furnaces are mostly made in Foshan Dongguan Guangdong, Qingdao Shangdong, Ningbo Zhejiang etc. For such electrical appliance onsite inspections as Electromagnetic furnace, the onsite quality inspection checklist will be as below.
The types of electromagnetic furnace QC inspections are mostly as follows:
Please find below for an example of the electromagnetic furnace check points for onsite test FYI:
CHECK LIST | COMMENTS | RESULT |
---|---|---|
Test all detailed functions according the instruction manual of the item's box.-II | PASSED | |
Test the function of the turntray, if test model has a turntray.-II | PASSED | |
Check the power usage (ie.: wattage).-S2 | N/A | |
Perform a Hi-pot test.-II According to UL2111 or EN60335-1: UL2111 - Less than 250v operated motors 0.5hp or less->1000V for 60S. - More than 250V operated motors or more than 0.5HP->1000+2Va for 60S EN60335-1 For less than 250V operated motors 1250/1750/3000V for60s according to the insulation (basic, supplementary, reinforced.) Take clear pictures for following information: AC/DC socket, Requested voltage and calibration label |
FAILED | |
Perform a stability test -S2 Perform the test on a surface inclined 10 degrees. please take clear picture to show that the product is in the most unfavourable position on the inclined plane. |
PASSED | |
Perform an earth continuity test if applicable. -II The result of test should be <0.1ohm. |
PASSED | |
Perform a pull test for power cord-S1 pull on the cord for 25time in 1 minute. If the product has a net weight</=1kg, use a force of 30N. If the product has a net weight 1kg>, </=4kgs, use a force of 60N, If the product has a net weight >4kgs, use a force of 100N- The cord should not be displaced more than 2mm. Noted: Before starting the test, you should pull the cord several times to make sure that no rolled cord inside the product. |
PASSED | |
Check the design of product to see effect.-S1 If the door is open, the magnetron can't work. |
PASSED | |
Perform an internal check.-S1 According to the BOM provided by client. a/ take all related picture to show each main component and prepare a list of them. b/ Check and show the quality of welding. c/ If the earth pin or any pin is not cinnected to wire; fail the test and put important remark. |
FAILED | |
Check the temperature at the minimum and maximum settings.-S1 Record the actual results |
PASSED | |
Perform a fatigue test for door and all adjustable parts.-S2 20 movements |
PASSED | |
Perform a life/endurance test for functions other than microwave.-S1 No overheating or other problem observed. |
PASSED |
electromagnetic furnace 3rd party inline inspection in China, electromagnetic furnace 3rd party inline inspection services in China, electromagnetic furnace third party inline inspection services, China electromagnetic furnace 3rd party inline inspection, China electromagnetic furnace third party inline inspection services, electromagnetic furnace third party inline inspection, electromagnetic furnace 3rd party inline inspection services, electromagnetic furnace inline inspection in China, China electromagnetic furnace 3rd party inline inspection services, China electromagnetic furnace inline inspection, electromagnetic furnace inline inspection services in China, China electromagnetic furnace inline inspection services, electromagnetic furnace 3rd party inline inspection, electromagnetic furnace third party inline inspection in China, China electromagnetic furnace third party inline inspection, electromagnetic furnace third party inline inspection services in China, electroma
3rd party preshipment products goods factory onsite final Random AQL PSI TPI FRI DUPRO third party on-site in-line pre-shipment QA QC check quality control assurance services in China India Vietnam Thailand Malaysia Bangladesh Taiwan.