Service Details

  • Home
  • Service Details

Lock preshipment inspection:


For the 3rd party quality inspections for locks, our checking procedures are:

INSPECTION CHECKPOINTS RESULTS COMMENTS
A. Quantity inspection N/A
B. Shipping marks & packing NOT OK
C. Labels, logos and colors OK
D. Styles & measurements OK
E. Onsite safety and function tests N/A
F. Special requirements NOT OK
G. AQL workmanship
(Visual inspections)
OK

There are several types of standard onsite QC checks for locks, listed as below:

lock preshipment inspection

The checklist for QC inspections of locks are as below:

INSPECTION CHECK LIST COMMENTS RESULT
Test all details functions according the instruction manual or the item's packing box.-II N/A
Perform a measurement and weight check. -S2 PASSED
Please check that number of pieces that the carton label reads, corresponds to the actual number of pieces packed. PASSED
Perform the fatigue test for all adjustable parts- Do the test 20times- There should be no damage to the item. S2 PASSED
- Product should be intact and free of material defects like Dents, Cracks, Breaks, Burr, Knob,
Mump, Scratch, etc.
PASSED
Assembly test according to the instruction manual/sheet. -S2 PASSED
Packaging method should be uniform and can protect the products from damage during
ocean/land/air transit.
FAILED
Fitting check- check product if it is for some special accessories.-II FAILED
Structure should be firm and free of defects like Uneven Button, Deformation, Gap, Hole, Poor
Connecting Points, Low Rigidity, Low Loading Capacity, Poor Assembly, etc.
PASSED
- Surface should be smooth and free of appearance defects like Pin Hole, Mold Mark, Flow PASSED
Mark, Burr, Sharp Point/Edge, Rough, Wrinkle, Fold Mark, etc.
- -The product should be clean and free of cleaning defects like Dirt, Smudge, Oil Mark, Rust, Black Spots, Finger Mark, Glue Mark, Peculiar Smell, Foreign Material, etc.
N/A
- All labels (like QC Mark, CO Mark, Price Label, Barcode, Warning Mark, & Specification
Label), Hangtag, Instruction Manual, Warrantee Card should be placed/applied on correct
places.
- check the shipping label on the cartons
PASSED
Product should be compared with the approval sample and client's requirement.-II PASSED
perform quantity and assortment check in each package. -S2 PASSED
-Products should be easily to assemble and unassemble. The parts or components should not
come off easily.
-check pallet packing
N/A
Good workmanship and free of defects like Untrimmed Thread, Poor Sewing, Short Shot,
Rough Surface, Poor Polish, Brush Mark, Missing Part, Color Deviation, Poor Finish, Poor
Coating, Poor Painting, Poor Printing, Poor Packing, etc.
PASSED

3rd party products goods factory onsite inline final Random AQL PSI TPI FRI DUPRO third party on-site in-line pre-shipment QA QC check quality control assurance services in China India Vietnam Thailand Malaysia Bangladesh Taiwan.

 

Menu
x