Service Details

  • Home
  • Service Details

Shunde cabinet quality control:


The furniture products like cabinets, are mostly made of MDF (medium density fiberboard), and some of them are of metal (steel file cabinets, aluminium cabinets etc.). The pre-shipment inspections for cabinets will check:

  • A. Quantity inspection
  • B. Shipping marks & packing
  • C. Labels, logos and colors
  • D. Styles & measurements
  • E. Onsite safety and function tests
  • F. Special requirements
  • G. AQL workmanship
    (Visual checks)

The 3rd party inspection services are mostly as below:

Shunde cabinet quality control

Please find below for an example of an on-site inspetion checklist for cabinets:

ONSITE INSPECTION LIST COMMENTS RESULT
Test the strength of the seams by hand—II PASSED
If the item is stuffed, check the stuffing to make sure it is dry, clean and contains no foreign objects--S1 PASSED
Perform a static loading test:
- 300 lbs during 1 hour on the center of every seat simultaneously, at least 5cm away from the edges
- There should be no obvious deformities
PASSED
Perform a fatigue test.- On all adjustable parts. Do this 20 times-S1 PASSED
Perform a wobble test.-On a flat place - No foot of the item should lift more than 2mm.-II PASSED
Perform a stability test.
-For the front: The chair should not tip over when pushed with a downward force at the front edge equal to 40% of the chair’s weight. For the rear: The chair should not tip over when it is loaded with 175lbs, and pulled with a force of 25 lbs from the rear. Please take clear picture to show that the product is in the most unfavorable position on the inclined plane.-S1
FAILED
Perform a stability test. -For the front: The chair should not tip over when pushed with a downward force at the front edge equal to 40% of the chair’s weight. For the rear: The chair should not tip over when it is loaded with 175lbs, and pulled with a force of 25 lbs from the rear. Please take clear picture to show that the product is in the most unfavorable position on the inclined plane.-S1 N/A
Perform a function test –II PASSED
Perform assembly test according the manual instruction step by step.-S2 FAILED
Perform a static loading test*- 300 lbs during 1 hour on the center of every seat simultaneously, at least 5cm away from the edges - There should be no obvious deformities PASSED
Perform moisture content test
–(Check the moisture content of all wooden parts.
- Check 3 points per piece and take the average data: (a+b+c)/3
- The moisture content for indoor products must be within 7%-12%; for outdoor products, it must be within 8%-16%.-S2)
PASSED
Perform a wobble test.-On a flat place - No foot of the item should lift more than 2mm.-II PASSED
Perform assembly test according the manual instruction step by step.-S2 PASSED
Perform a function test –II PASSED
Test the strength of the seams by hand—II N/A
Perform moisture content test –(Check the moisture content of all wooden parts. - Check 3 points per piece and take the average data: (a+b+c)/3 - The moisture content for indoor products must be within 7%-12%; for outdoor products, it must be within 8%-16%.-S2) PASSED
If the item is stuffed, check the stuffing to make sure it is dry, clean and contains no foreign objects--S1 PASSED
Perform a fatigue test.- On all adjustable parts. Do this 20 times-S1 PASSED

3rd party preshipment products goods factory onsite inline final Random AQL PSI TPI FRI DUPRO third party on-site in-line pre-shipment QA QC check assurance inspection services in China India Vietnam Thailand Malaysia Bangladesh Taiwan.

 

Menu
x